top of page

193 OXFORD STREET
Client: McKillen Donovan Trust | Sector: Pension Fund | Scope: Cat B Fit Out | Size: 20,000sq ft | Budget: £6M
In addition to the Cat A fit out and modernisation of the vertical circulation, works included developing complex interface details between the existing building and the Future Systems designed façade. Further to this, a new WC core has been designed within the space of a disused lift shaft.
![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
---|---|---|---|---|---|
![]() |
bottom of page